consulting, on behalf of Technital S.p.A., was carried out in the scope of executive design and details regarding a number of 15 constructions including Administration Buildings and Water Potabilization, Treatment and Management Tanks: Administration Building, Guard House, Maintenance Building and Storage, MBBR (Moving Bed Biofilm Reactor) Chamber and MBBR Tank, Clarifier Distribution Chamber, Clarifier, Waste sludge, Gravity thickener, Preliminary Treatment, Pre-Sedimentation, Coagulation-Flocculation, Sedimentation, Filtration (Building and Tank), Gravity Thickener. The urbanization works for the development of the new Smart City of Konza (Phase 1) will involve the settlement of about 30,000 inhabitants and as a whole will involve the creation of a new urban area (the future Silicon Savannah) in Machakos and Makueni counties, which are located about 70 km from Nairobi along the Nairobi-Mombasa route.